The process took 2 days. I interviewed at SLB (Houston, TX) in Nov 2011
Interview
During the phone interview with Smith Bits, a Schlumberger Company now, I was asked basic questions that pertained to my resume. Afterwards, I was flown into Texas for a 1:1 interview with 4 different team members that I may be working with if I get hired. Then I took a tour around the facility.
Interview questions [1]
Question 1
There are 6 matches, represented as lines, on this paper. Make four triangles with them.
I applied through university. The process took 2 weeks. I interviewed at SLB (Kuala Lumpur)
Interview
Difficult and mentally challenging. Requires up to 3 stages. 1-group dynamics where you are tested in groups. You have group activities and is watched. After group activities you have group interview and you eliminate your own group-mates. At this stage, be selfish and think of yourself. You want this job as much as they do. 2-individual interview. Only selected individuals after the group stage make it here. This is where technical & personality questions are asked. Be prepared. 3-managerial stage iv. Didn’t made it to this stage
Virtual interview with both engineering manager, where they tell about the current project and why should choose SLB. Why choose to work in singapore. How to handle stress. Discuss about the team size. What should we offer
I applied through university. The process took 1 day. I interviewed at SLB (Pune) in Aug 2025
Interview
Two rounds
Technical based on Power Electronics
Asked basics of MOSFETS, and completely about the resume
HR
To know you more
Asked the questions on imprvisation in PPT they conducted before recruitment drive. Why SLB over other PSU?
Interview questions [1]
Question 1
About Power electronics and Everything about MOSFETS